[sap-acct] CO - Distribute Proportianal Costs

Posted by SAPALLIT (FICO Consultant )
on Aug 11 at 12:35 PM
Hi,
I having some trouble when using automated allocation in CO. Basically the problem arise when trying to transfer cost using the variable method (5 Actual Statistical Key Figures) using Stat. key fig. and Activity Type.

I was hoping that someone could explain to me how the process associated to variable method works:
I have created and planned Activity and key Figures and respective cost centre
I have posted a document from FI and from Time Sheet (the time sheet as the activity type)

I have created an allocation which it works when using Fixed % or Amount but not on the case above.

I believe that I am missing something. Whether that is in the initial posting or in the way master data must be maintained I am not sure. Any help would be beneficial.

Thanks
P
__.____._
Copyright © 2011 Toolbox.com and message author.

Toolbox.com 4343 N. Scottsdale Road Suite 280, Scottsdale, AZ 85251
View this online
  
Popular White Papers

In the Spotlight
View the "Managing the Application Life Cycle" webinar and learn how organizations optimize their SAP applications.
_.____.__

0 nhận xét:

Post a Comment

Blog Archive